Eagerly awaiting to join the BG network, clean and tip top mailani junction ready with crs trials of lakhimpur- mailani section.
Three BG platforms(one high level and two medium level) ready with drinking water, high drain pipes and FOB apart from the two existing low level MG platforms
Mailani-pilibhit section GC work going on in full swing as laying of tracks on the set sleepers going on. L&T has been given that contract.
Three BG platforms(one high level and two medium level) ready with drinking water, high drain pipes and FOB apart from the two existing low level MG platforms
Mailani-pilibhit section GC work going on in full swing as laying of tracks on the set sleepers going on. L&T has been given that contract.