Search Forum
Blog Entry# 4495333
Posted: Nov 23 2019 (11:52)
1 Responses
Last Response: Nov 23 2019 (12:11)
1 Responses
Last Response: Nov 23 2019 (12:11)
Nov 23 2019 (11:52) 12321/Howrah - Mumbai CSMT Mail (Via Gaya) (PT) | ACOI/Allahabad Chheoki Junction (3 PFs)
ManishSinghPRYJ~
ManishSinghPRYJ~ 1321 blog posts24 coach 12321 HowrahMumbaiMail hauled by Etarsi WAP-4 22874 arrived right time at 1125 hrs at ACOI platform 2 (Pic 1& Pic 2)
Pic 3 & 4: Work for 24 coaches New Platform at ACOI(To be named Plt-4 )started in dec last year, half made till now, still continued at tortoise speed towards Vindhyachal/ DDU end (North side of Main Line)
Pic 3 & 4: Work for 24 coaches New Platform at ACOI(To be named Plt-4 )started in dec last year, half made till now, still continued at tortoise speed towards Vindhyachal/ DDU end (North side of Main Line)
Soil dugged on platform 1, 2-3, north end, south end of ACOI near old FOB base.
I think, they are going to modify the FOB like newer one made in 2017 by breaking ladders and making slope in place, which is being made in entire railways.
So that passengers (Mostly travelling with wheeltrolly bags nowadays) can change platforms/ enter station easily
I think, they are going to modify the FOB like newer one made in 2017 by breaking ladders and making slope in place, which is being made in entire railways.
So that passengers (Mostly travelling with wheeltrolly bags nowadays) can change platforms/ enter station easily