Search Forum
Blog Entry# 4511730
Posted: Dec 12 2019 (07:32)
6 Responses
Last Response: Dec 17 2019 (07:36)
6 Responses
Last Response: Dec 17 2019 (07:36)
*** HIGH SPEED TRAIL of 145 Km/Hr ***
.
A High Speed Trial with a Speed of 145 Km/Hr with WAP-7 Locomotive + 1 LHB Coach will be conducted on 13th of December 2019 between Dankuni and Baruipara section of Howrah Bardhaman Chord(HBC) section of Eastern Railway. Timing : 10 AM to 7 PM.
.
A High Speed Trial with a Speed of 145 Km/Hr with WAP-7 Locomotive + 1 LHB Coach will be conducted on 13th of December 2019 between Dankuni and Baruipara section of Howrah Bardhaman Chord(HBC) section of Eastern Railway. Timing : 10 AM to 7 PM.
4 Public Posts - Thu Dec 12, 2019
It is the newly constructed 4th line (which is not even connected to main line at DKAE,though connected to Up loop/PF4 of JOX & BRPA) on which the trial was supposed to be done before CRS inspection. But line fit certificate has been withdrawn today evening cancelling the trial.
1 Public Posts - Tue Dec 17, 2019