Search Forum
Blog Entry# 4514588
Posted: Dec 15 2019 (19:03)
16 Responses
Last Response: Dec 16 2019 (16:35)
16 Responses
Last Response: Dec 16 2019 (16:35)
Dec 15 2019 (19:03) 12756/Bhavnagar Terminus - Kakinada Port Weekly Superfast Express (PT) | BDPL/Bandarupalle (1 PFs)
Ramkumar^~
Ramkumar^~ 18301 blog posts1,2,3 Pics:- KZJ WDM-3A twins with 17203 BVC - COA Express
4-7 pics:- 22069 BZA WAP-4 with 17231 NS - NSL Via-GNT Express
8,9 Pics:- 12461 PUNE WDG-4 with BOXN rake
10th Pic:- 22247 BZA WAP-4 with 17230 Sabari Express.
4-7 pics:- 22069 BZA WAP-4 with 17231 NS - NSL Via-GNT Express
8,9 Pics:- 12461 PUNE WDG-4 with BOXN rake
10th Pic:- 22247 BZA WAP-4 with 17230 Sabari Express.
11 Posts
U have Rake shuntings going towards yard in 3rd line , the other two lines will be occupied with MMTS movement, Shatabdi, Falaknuma empty rake shunting, Hubli Express loco change(Loco coming from HYB)
So in short they (SC) are waiting for DD-WADI to be electrified to run this on EL...
2-2:30 nundi strat avutundi BMT side traffic..Shatabdi and then Devagiri rake shunting and then MMTS movement and then Falcon arrival...adi oka bottle neck for SC towards BMT side...MLY side loco will ready by the time rake arrives for reversal ...ala ani manodu tondaraga chesthadu ani kaadu ..andulo kuda delay chesthadu but relatively much better compared to BMT side...snsi slot kuda anthe which comes from BZA side...never leaves SC without having 30-40m halt minimum
Hope they better start electrifying the current single line and open for traffic or may be some stretches have this scissor crossings in between KLBG-SUR that might be preventing them..