Dec 17 2019 (17:19) 78051/Masagram - Bankura DEMU | MSAE/Masagram (5 PFs)
SAPTARSHI^~
SAPTARSHI^~ 26509 blog postsEnergization of "Masagram Bankura Single Line section" on 15.01.20 #BDR
21 Posts
4th line ta ekhono Masagram pouchoini. Dekha jak kotokhon somoi nei connect korte.
Amar mone hoche oi 4th line ta connect korbe Bankura-Masagram line tar sathe.... r Masagram theke Howrah jaor crossing stn outer a already present ache....oi crossing theke MASAGRAM-HWH local towards Howrah crossing kore 3rd loop theke 1st or 2nd line a giye..so no problem... baas Bankura line ta k 4th line er sathe connect korle hobe...bacause 4th to 3rd crossing o banabe ER and 3rd to 2nd and 1st line er crossing already present ache MSAE outer a.
ER is very much skeptical about linking SER at Masagram. Cross over is not a problem if so then there should be no Reversal/change of loco at Durgapur(PF 1) for NEF bound trains like Ypr-Kyq Ac exp, vivek exp, ranchi-kyq, Mldt-ST, tmbm-Ghy/DBRT, Jaj-dbrt, Mas-njp, Puri-Kyq, Kcvl-Ghy spl etc. For entry in PF 1 of Durgapur from down twin lines these trains have to cross over all important Quadrple section of Shaktigarh-Sitarampur section at Durgapur.
Yes agree with you that "ER is very much skeptical about linking SER at Masagram. ".
But Masagram and Durgapur both r different. You cannot compare both cases.
But Masagram and Durgapur both r different. You cannot compare both cases.