Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

22626 SBC-MAS Double Decker - எப்பவுமே டாப் டக்கர் - Vijay Baradwaj

Search Forum
<<prev entry    next entry>>
Blog Entry# 4519176
Posted: Dec 20 2019 (23:11)

8 Responses
Last Response: Mar 25 2021 (20:59)
Info Update
409436 views
2

Dec 20 2019 (23:11)   KGLE/Khagraghat Road (4 PFs)
SAPTARSHI^~
SAPTARSHI^~   26416 blog posts
Entry# 4519176            Tags   Past Edits
CRS Inspection for 'Opening of new double line' between Khagraghat Rd. & Lalbagh Court Rd. of B.A.K Loop is to be conducted on 21.12.19
Translate to English
Translate to Hindi

3 Posts

116997 views
6

Mar 25 2021 (19:29)
SAPTARSHI^~   26416 blog posts
Re# 4519176-4               Past Edits
CRS Inspection for 'Opening of New double line'
i) between Gangatikuri & Katwa of B.A.K Loop is conducted on 25.03.21. (Howrah division)
ii) between Chowrigacha & Karnasubarna of B.A.K Loop is conducted on 26.03.21. (Howrah division)
Translate to English
Translate to Hindi

94259 views
0

Mar 25 2021 (19:32)
Harsh12345ER~   21389 blog posts
Re# 4519176-5              
how they opened the 2nd line without diverting trains ?
Translate to English
Translate to Hindi

95307 views
1

Mar 25 2021 (19:40)
SAPTARSHI^~   26416 blog posts
Re# 4519176-6               Past Edits
The new line is not used for any regular traffic till the commissioner permits. So all regular traffic will run through existing single line on scheduled path. CRS inspection of new line is not usually expected to disrupt operation of regular line.

The Operation of the regular line shall be disrupted only when some work is done on that line, like CRS inspection of Electrification (when commissioner will block that line & other trains shall require regulation/diversion), or any non interlocking works (when points & cables are mostly re-installed)
Translate to English
Translate to Hindi

93739 views
0

Mar 25 2021 (19:44)
Harsh12345ER~   21389 blog posts
Re# 4519176-7              
AFAIK interlocking Works are always performed before CRS inspection 🤔🤔
Translate to English
Translate to Hindi

95800 views
2

Mar 25 2021 (20:59)
SAPTARSHI^~   26416 blog posts
Re# 4519176-8              
Depends upon division... Sometimes they do before CRS insp.... sometimes after CRS insp....and sometimes even during CRS inspection as for the above case (as mentioned by respected member in /blog/post/4876868 )
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy