Search Forum
Blog Entry# 4520698
Posted: Dec 23 2019 (02:07)
4 Responses
Last Response: Dec 23 2019 (22:38)
4 Responses
Last Response: Dec 23 2019 (22:38)
Train no. 11013/11014 runs from LTT to Coimbatore. This train daily runs late by 6 to 8 hours. To improve efficiency change the route for 3 days i.e. on Fri, Sat & Sun from LTT-Panvel-Ratnagiri-Madgaon-Mangalore-Shoranur-Coimbatore and on Sat, Sun & Mon for the return journey.
Further, extend this train to Madurai via Coimbatore-Erode-Karur-Dindigul-Madurai or extend to Tiruchhirapalli via Coimbatore-Erode-Karur- Tiruchhirapalli.
This train route will connect the above places and reach within the shortest possible time using Coastal railway route. All the places covered in this route are important tourist destinations and...
more...
Further, extend this train to Madurai via Coimbatore-Erode-Karur-Dindigul-Madurai or extend to Tiruchhirapalli via Coimbatore-Erode-Karur- Tiruchhirapalli.
This train route will connect the above places and reach within the shortest possible time using Coastal railway route. All the places covered in this route are important tourist destinations and...
more...
First of all this was introduced as Bangalore LTT express then later it was snatched from Bangalore and was extended to CBE. Now how can you demand for diversion for this train and if its diverted what should SBC pax do ? Instead of it ask for a new train from CBE to Mumbai and moreover very less pax travel end to end only SBC pax travel in this train to CBE. This train is better compared to Udyan from Bangalore to Mumbai. So this train will continue to run in the present route
The change in route is for 3 days in a week and the existing route will continue for 4 days. This suggestion is to increase efficiency as the train perennially runs late
No need its a lifeline for Bangalore people to travel to Gulbarga and Mumbai