SWRailway^~ 13440 blog postsPic 1-3 BYPL ramp connecting SA line got electrified. With this electrification of enitre 48 kms of BYPl HSRA section is completed and after HSRA till Rayakottai ohe poles are being laid and by end of 2020 upto DPJ works will be completed and according to some sources electrification works have been started from Omalur side also but no confirmation about that. Now BAW UBL and YNK KQZ are the last remaining important routes which must be electrified.
Pic 4,5,6 and 7 Shots in YNK DMM section which was recently upgraded to 115 kmph mps. Some curves was made more inclined and sleepers were replaced with heavier ones along with that 60 kg rails were placed to fit higher speeds and main...
more...
Pic 4,5,6 and 7 Shots in YNK DMM section which was recently upgraded to 115 kmph mps. Some curves was made more inclined and sleepers were replaced with heavier ones along with that 60 kg rails were placed to fit higher speeds and main...
more...
7 Public Posts - Wed Dec 25, 2019
Any idea when is trial run with electric loco and CRS of electrification?