Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Chennai EMU - என்னோட உயிர் டா நீ

Search Forum
<<prev entry    next entry>>
Blog Entry# 4527345
Posted: Dec 31 2019 (11:12)

12 Responses
Last Response: Jan 23 2020 (17:58)
Poll
81646 views
41 votes
0

Dec 31 2019 (11:12)   12305/Howrah - New Delhi Rajdhani Express (Via Patna) | HWH/Howrah Junction (23 PFs)
AvishekRay~
AvishekRay~   3874 blog posts
Entry# 4527345            Tags   Past Edits
#Forecast (Let's play a guessing game)
****
As per a report published in today's newspaper IR has claimed that by 2021 there won't be any wait listed passenger on Kolkata- Delhi route. When asked on how they are going to do it, they have said that they will increase the operating speed of all the trains on that route up to 160 Km/H. As a result, average speed of all the existing trains will significantly increased and many new trains will be introduced. Thus the wait list will be cleared.
What
...
more...
is your opinion on the possibility of that claim?

Translate to English
Translate to Hindi
NO vote
Impossible. it's nothing but a gimmick
73%
30
Partially pissible
22%
9
Totally possible
0%
0
Not sure
5%
2
Any other opinion (Please comment)
0%
0

9 Posts

30002 views
0

Jan 18 2020 (18:40)
AvishekRay~
AvishekRay~   3874 blog posts
Re# 4527345-11              
Votes...
Translate to English
Translate to Hindi

30275 views
1

Jan 19 2020 (13:09)
madanmohanmeena^~
madanmohanmeena^~   15466 blog posts
Re# 4527345-12              
Duranto, rajdhani jaisi trains me waiting khatam kar sakte h unka fare increase karke, baki to Sf trains me possible nahi h.
Translate to English
Translate to Hindi

30191 views
1

Jan 19 2020 (18:26)
A2Z~
A2Z~   17505 blog posts
Re# 4527345-13              
Reservation / Train on-demand is difficult, but not impossible
* After commissioning of DFCs, number of freight trains on the NDLS-BCT/HWH routes shall be very less or negligible and these routes shall be like Dedicated Passenger Corridors. Absence of slow-moving freight trains shall substantially increase the sectional capacity and avg speed of express trains, and many new trains may be started thereby reducing the waitlists (maybe eliminating W/Ls).
* 160kmph speed shall not be possible for premium (fully ac) trains on full route. Jump in avg speed from 80-90kmph to 100-110kmph is
...
more...
possible for top priority Rajdhani trains.
*To ensure full availability of berths, a smooth flow of traffic has to be ensured by running all the non-ac express trains at 130kmph with LHB coaches and avg speed of 70-90kmph. In fact, there may be fast-moving trainsets with non-ac coaches as well.
* To ensure zero waiting lists, the speed restrictions have to be eliminated and bottlenecks at ghat sections/ curves/ gradients have to be gradually eased out so that sectional capacity is maximised.

Translate to English
Translate to Hindi

28668 views
0

Jan 23 2020 (17:58)
AvishekRay~
AvishekRay~   3874 blog posts
Re# 4527345-14              
^^
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy