Search Forum
Blog Entry# 4535863
Posted: Jan 09 2020 (21:15)
2 Responses
Last Response: Jan 18 2020 (00:23)
2 Responses
Last Response: Jan 18 2020 (00:23)
🔹Speed trial of "BARASAT BANGAON (Up line)" & "BANGAON RANAGHAT single line" at 110kmph
🔹Purpose - Confirmatory trial using Light Engine before GM's annual Inspection in aforesaid section.
🔹Date - 09.01.20
🔹Nominated power - HWH WAP4 22771
🔹Copy...
more...
🔹Purpose - Confirmatory trial using Light Engine before GM's annual Inspection in aforesaid section.
🔹Date - 09.01.20
🔹Nominated power - HWH WAP4 22771
🔹Copy...
more...
Annual Inspection by General Manager, Eastern Railway has started on 17.01/18.01.20 (midnight Inspection) over Sealdah division (aforesaid section) via-Sealdah (d.21:50), Barasat (a.22:20), Bangaon, Ranaghat.
Power No.30323 HWH WAP7 in lead
Power No.30323 HWH WAP7 in lead