Search Forum
Blog Entry# 4540656
Posted: Jan 15 2020 (12:51)
5 Responses
Last Response: Jan 15 2020 (16:42)
5 Responses
Last Response: Jan 15 2020 (16:42)
Jan 15 2020 (12:51) यूपी की कारपोरेट सेक्टर की दूसरी ट्रेन 21 फरवरी से दौड़ेगी, रेलवे बोर्ड ने दी मंजूरी-ये होगा रूट
Sonugaya~ 218 news posts
Select Language
...
...
- Triweekly TEJAS EXPRESS (sleeper version) on to start operations from 17.2.20 BSB-LKO-CNB-JHS-BPL-UJN-INDB route. - Rake is reportedly allotted from RCF, Kapurthala.
- Triweekly full ac premium train most probably with dynamic fares (fares more than of equal to Rajdhani fares) may not get enough patronage on this route. Train with normal ac fares may get decent patronage.
-about 1150 kms have to be covered in just 17-18 hrs instead of about 22 hrs taken by the express trains operating on the route.
- Triweekly full ac premium train most probably with dynamic fares (fares more than of equal to Rajdhani fares) may not get enough patronage on this route. Train with normal ac fares may get decent patronage.
-about 1150 kms have to be covered in just 17-18 hrs instead of about 22 hrs taken by the express trains operating on the route.
i think it may be a humsafar type with automatic doors like nanded one has
One doubt why is the door in the opp side of PF need to open. Does this automatic door have sensors and GPS operated when the train approaches station or done manually from a central point only during halts at station.
Really no idea most probably central control from guard cabin like others