➡️ Speed test conducted by the Railway Safety Commissioner was successful today with a maximum speed of 122 kms on the new (second) railway line at Perecharla-Satalur.
This will pave the way for the arrival of trains on the new (second) railway line between Perecharla-Satalur, with a maximum speed of 80 km per hour.
➡️ The first train to run on the new (second) railway line was yesterday's 17252 GNT - KCG Express. All remaining coaching / goods trains are running on the new (second) train line.
This will pave the way for the arrival of trains on the new (second) railway line between Perecharla-Satalur, with a maximum speed of 80 km per hour.
➡️ The first train to run on the new (second) railway line was yesterday's 17252 GNT - KCG Express. All remaining coaching / goods trains are running on the new (second) train line.
Since it is newly commissioned..
There is speed restrictions upto specific period of time for new lines. They will increase after
5/6 months
There is speed restrictions upto specific period of time for new lines. They will increase after
5/6 months
They will increase the speed upto 100/110 kmph .. within 5-6 months .. not more than that ..
Newly laid track always require soil settlement and soil takes time to settle. They will increase it progressively.