Search Forum
Blog Entry# 4558177
Posted: Feb 06 2020 (12:30)
5 Responses
Last Response: Feb 06 2020 (18:26)
5 Responses
Last Response: Feb 06 2020 (18:26)
It is doing Ndls to BPL in 8 hours
It means that Nzm to BPL gtimaan can do easily In 7 hour 20 mins because Gatimaan has 160 MPS between nzm and AGC
If MPS of Gatimaan is increased to 180
Then nzm to BPL can be done in 7 hour 10 mins.
It means that Nzm to BPL gtimaan can do easily In 7 hour 20 mins because Gatimaan has 160 MPS between nzm and AGC
If MPS of Gatimaan is increased to 180
Then nzm to BPL can be done in 7 hour 10 mins.
A lot more trains are doing the same ..
22222 doing nzm - bpl in 7:40 hrs ..
With 130 only ..with twin p7s ..
U shld see the run on this aggressive beast ..
22222 doing nzm - bpl in 7:40 hrs ..
With 130 only ..with twin p7s ..
U shld see the run on this aggressive beast ..
4 Public Posts - Thu Feb 06, 2020