Search Forum
Blog Entry# 4563445
Posted: Feb 12 2020 (16:51)
11 Responses
Last Response: Feb 14 2020 (20:34)
11 Responses
Last Response: Feb 14 2020 (20:34)
Any updates on this train to be considered for eloco between Mysore and ballari since loco change is happening for tpty hubli pass at Ballari?
6 Posts
Scr giving eloco to JP mys sf from gtl in peak hours as well only major factor being lr involved in that case
🔹12975/12976 - MYS - JP - MYS Express has LR at Guntakal Junction. So they are doing LC instead of LR i.e., they attach diesel loco on one end detach electric loco from other end and vice versa. This process will take less time
🔹They are doing same process for trains which comes towards Ballari like 11303/11304 - Manuguru - SCSMT Kolhapur - Manuguru Express and 18111/18112 - Tatanagar - Yeswantpur Express at Guntakal Junction
🔹But Hampi Express doesn't belong to this category because LR will not be required at Guntakal Junction for...
more...
🔹They are doing same process for trains which comes towards Ballari like 11303/11304 - Manuguru - SCSMT Kolhapur - Manuguru Express and 18111/18112 - Tatanagar - Yeswantpur Express at Guntakal Junction
🔹But Hampi Express doesn't belong to this category because LR will not be required at Guntakal Junction for...
more...
Yes, 30 minutes halt minimum dena hoga and accordingly TT modify hoga kyuki bina push pull arrangement ke p7 bhi utna time cover nahi kar sakta, which is again a complication
GTL is having ETS so it will be easy for SCR to arrange locos if LC takes place at GTL whereas MYS is not having ETS so if BAY should be LC point then MYS should provide locos by doing LSA with some SBC train i.e Tippu Express is best suited and RPM WAP-7 is the regular link for Tippu but i dont know about LSA pattern for electric locos taking place at MYS and even the electric locos of SBC ETS will be busy and if MYS provides the locos then RPM WAP-7 should only be the link for which i dont think SBC will agree
🔹IMO Mysuru must supply electric locos (even if takes time) because we don't know ETS will have idle locos to spare at the timings of 16591 - Hubballi - Mysuru Hampi Express
🔹If Mysuru supplies electric locos then LC point can be GTL/BAY/HPT (in future). Finally same electric locos can take charge of end to end run
🔹If Mysuru supplies electric locos then LC point can be GTL/BAY/HPT (in future). Finally same electric locos can take charge of end to end run