Search Forum
Blog Entry# 4601495
Posted: Mar 23 2020 (22:27)
39 Responses
Last Response: Mar 29 2020 (20:40)
39 Responses
Last Response: Mar 29 2020 (20:40)
Mar 23 2020 (22:27) 20805/Andhra Pradesh Express | VSKP/Visakhapatnam Junction (8 PFs) | LGD/WAP-7(I)/30602
TheLucifer
TheLucifer 6796 blog postsOn 21st 20805 Andhra Pradesh Express with 30602 LGD WAP-7 (i) link upto Vijayawada
Was on onboard
Was on onboard
34 Posts
Here we are discussing about tkd- agc/lar section.
Not about Kharagpur - Waltair - Vijayawada.
Not about Kharagpur - Waltair - Vijayawada.
Majority of LGD WAP-7 fitted with RDS & some new LGD WAP-7 coming up with btil propulsion system.
You mentioned 120kmph at Pithapuram and you talked about DVD-BZA route being fit for 120kmph. That was what I replied for.
It is simply a matter of loco allotment. Traffic density is much higher in the north than south and most of the main routes in the north have been electrified for a long time. So, GZB tends to supply links for those routes.
However, most trains coming from south have a long turn-around time at Delhi or any north destination as the rakes go for secondary maintenance. This leaves their locos, typically LGD/RPM WAP7 or ED WAP4, idle for a long time. So, they allot them for other duties.
However, most trains coming from south have a long turn-around time at Delhi or any north destination as the rakes go for secondary maintenance. This leaves their locos, typically LGD/RPM WAP7 or ED WAP4, idle for a long time. So, they allot them for other duties.
😂 Ok
yeah on that day AP was almost hitting 120
after full green at Pithapuram Outer.
AP trashed Pithapuram station.
yeah on that day AP was almost hitting 120
after full green at Pithapuram Outer.
AP trashed Pithapuram station.