Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Rockfort Express: திருச்சி அவனது கோட்டை, இரவில் சென்னை வரை வேட்டை, அவன் தான் மலைக்கோட்டை. - Vijay Baradwaj

Search Forum
<<prev entry    next entry>>
Blog Entry# 4602669
Posted: Mar 26 2020 (21:14)

1 Responses
Last Response: Mar 26 2020 (21:33)
General Travel
1269 views
0

Mar 26 2020 (21:14)  
guest
Entry# 4602669              
What is the history of LHB coach ?
During 1993-94, Indian Railways decided to look for a passenger coach design which would be lighter and capable of higher speeds compared to their existing rakes. The main features of the Railways' specification were high speed light weight coaches to run on the present infrastructure of the Indian Railways, i.e. the railway, track and environmental conditions in India at an operating speed of 160 km/h. It was decided by the Railways that the design would first be tried in the Rail Coach Factory in Kapurthala (RCF), and upon successful completion of this trial, it would be tried in the Integral Coach Factory in Perambur.
In
...
more...
1995, after a global selection process, Alstom-LHB received the order from Indian Railways to design and develop a new passenger coach under a transfer of technology agreement. As part of the order, Alstom-LHB had to execute two contracts, one for the supply of "Light Weight High Speed Coaches for Broad Gauge" which includes the development, design and manufacture of 19 AC 2nd Class Chair Cars, 2 AC Executive Class Chair Cars and 3 Generator-cum-Brake vans and the other contract for the "Technology Transfer" which includes the transfer of technology for design and manufacturing, the training of Indian Railways personnel in the premises of the manufacturer and the technical assistance at RCF during the start of production.
Out of the 24 coaches imported from Germany, all of them mostly being Air Conditioned chair cars, the first lot were used for New Delhi-Lucknow Shatabdi Express on a trial basis. It didn't turn out be successful as the coaches' wide windows were targets of mischief and stone-pelting. Railways had to use sealing tapes to tape up the bruised windows. When these rakes were brought into service, couplers came unstuck and the data collected from the passenger feedback showed that the air conditioning was not "very effective". They were withdrawn from service and after attending to the problems, Railways reintroduced them on the New Delhi-Lucknow Shatabdi Express and proved successful.
The RCF began to manufacture other variants of LHB design like the air conditioned first class, AC 2 tier sleeper, AC 3 tier sleeper, hot buffet (pantry) car etc., from 2001 to 2002, and rolled out its first rake in December 2002. The first such rake was introduced for Mumbai-New Delhi Rajdhani Express in December, 2003. Up to March 2011, 997 LHB coaches were produced by the RCF. All of these coaches are being used in premium trains like Rajdhani, Shatabdi, Duronto Express, superfast trains and have been offering better passenger comfort.Soon, all the Duronto trains will be equipped with LHB coaches.

Translate to English
Translate to Hindi

745 views
1

Mar 26 2020 (21:33)
Sanz~
Sanz~   8527 blog posts
Re# 4602669-1              
@4602669-0  @guest
So we could have got LHB a lot earlier and achieved complete migration from ICF to LHB
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy