Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Shiv Ganga Express: mera bhola hai bhandari, karta Shiv Ganga ki sawari... Kashi Vishwanath Re, ohh bholenath Re... - Divyanshu Gupta

Search Forum
<<prev entry    next entry>>
Blog Entry# 4636670
Posted: May 25 2020 (12:29)

2 Responses
Last Response: May 25 2020 (23:21)
Travel Question
2180 views
3

May 25 2020 (12:29)   NDLS/New Delhi (16 PFs)
ErArani^~
ErArani^~   9314 blog posts
Entry# 4636670            Tags  
Lets have a discussion, which Railways can do during this lock down time to ensure smooth operation in future:
1. Entire IR time table may be made realistic with increase/ decrease in time travel based on actual record.
2. All coaches with faulty electrical/ mechanical parts may be replaced.
3. Booking quota and no of seats allotted against each quota may be revised.
4.
...
more...
Coach composition of trains where severely required, may be updated accordingly.
5. Extra stops may be removed with proper reversal timings inclusion in time table.
Any other suggestion ?

Translate to English
Translate to Hindi

1371 views
1

May 25 2020 (14:35)
ahm33966~   4374 blog posts
Re# 4636670-1              
Who will replace faulty coaches?
Instead in this lockdown period many coaches became faulty with coaches parked at different places and rats and others have caused damage to new coaches also at some places.
Coaches were just kept parked at different places during this lockdown period.
But your suggestions are good if followed properly.
Translate to English
Translate to Hindi

1174 views
1

May 25 2020 (23:21)
RFIR~
RFIR~   6898 blog posts
Re# 4636670-2              
One thing that came to mind is that with social distancing being the new norm....at least they should try and removed middle berths of all Garib Rath Trains (wherever present). Or else simply phase out garib rath trains and convert them to regular express trains ! In the current situation a full fledged AC train with cramped space may not be a good option
Reduction in stoppages and speed up is something definitely to be looked at!
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy