Search Forum
Blog Entry# 4652845
Posted: Jun 18 2020 (16:06)
5 Responses
Last Response: Jun 18 2020 (21:22)
5 Responses
Last Response: Jun 18 2020 (21:22)
What i thought with this train, the same is proposed in IRTTC 2020.
TT is revised and this train will run at 130kmph between PRYJ and ALJN with reduced stops. (Stops at FTP, CNB,ETW,TDL,ALJN rest all same as before between ALJN and DDN)
4 LHB coaches required with 12 coaches each.
Total 16 hrs time will be elapsed between PRYJ and DDN now....
more...
TT is revised and this train will run at 130kmph between PRYJ and ALJN with reduced stops. (Stops at FTP, CNB,ETW,TDL,ALJN rest all same as before between ALJN and DDN)
4 LHB coaches required with 12 coaches each.
Total 16 hrs time will be elapsed between PRYJ and DDN now....
more...
2 Public Posts - Thu Jun 18, 2020
Maine bhi yehi kaha hai.
Aur rahi baat KGM-DDN Express, to uske TT me bhi change aayega guaranteed, mostly MB-LKU-KGM section me...
Sirf aage dekhte jaao
Aur rahi baat KGM-DDN Express, to uske TT me bhi change aayega guaranteed, mostly MB-LKU-KGM section me...
Sirf aage dekhte jaao
2 Public Posts - Thu Jun 18, 2020