Search Forum
Blog Entry# 4658478
Posted: Jun 28 2020 (08:51)
28 Responses
Last Response: Jun 29 2020 (07:25)
28 Responses
Last Response: Jun 29 2020 (07:25)
Jun 28 2020 (08:51) IMG38091-1422835/♥♥PUNE-GORAKHPUR DURONTO (VIA PRAYAGRAJ-VARANASI)♥♥
90646 net green flags 13 green per TrainCustom Ratings
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~ 6962 img trains 6920 popular90646 net green flags 13 green per TrainCustom Ratings
A Possible Fast connectivity in between these two cities.
Please Flag
Please Flag
28 Posts
mai to as per MAP bola hu aur Vande Bhaarat BSB end hai jo electrified hai already. Mai PRYJ mai L/c isiliye kiya taki LR time kam hojaye.
Dear
Electrification is done and trains are plying over it bw pryj & BSB
Issue is bw BSB & GKP as Electrification bw arj & btt is not done
So take ELoco up to BSB and then attach DLoco from BSB
Electrification is done and trains are plying over it bw pryj & BSB
Issue is bw BSB & GKP as Electrification bw arj & btt is not done
So take ELoco up to BSB and then attach DLoco from BSB
agree it is good. but when i am doing LR in PRYJ where it takes 20 Monts officially i just replaced D-loco on other side as LR and detached E-Loco . which took only 10-15 mints. so i chosen PRYJ. if u still feel i will change.