Search Forum
Blog Entry# 4658530
Posted: Jun 28 2020 (10:22)
4 Responses
Last Response: Jun 28 2020 (11:11)
4 Responses
Last Response: Jun 28 2020 (11:11)
Jun 28 2020 (10:22) IMG47938-1422835/♥♥RAJENDRANAGAR TERMINAL-ANAND VIHAR TERMINAL EXPRESS (VIA GORAKHPUR-BAREILLY)♥♥
90356 net green flags 13 green per TrainCustom Ratings
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~ 6937 img trains 6899 popular90356 net green flags 13 green per TrainCustom Ratings
2 Posts
Observations:
Provide 2 min halt at Patliputra and Shahjahanpur.
Reduce speed in Gonda-Sitapur-Shahjahanpur chord section. This train is overspeeding. Consult the already running trains of this section.
Provide 2 min halt at Patliputra and Shahjahanpur.
Reduce speed in Gonda-Sitapur-Shahjahanpur chord section. This train is overspeeding. Consult the already running trains of this section.
done as per current running train. but as RJPB and PNBE is there PPTa Skipped. i dont want 3 halts in patna only.
Oka..
1 more observation:
reduce halt duration at Bareilly to 3 minutes, and increase the halt duration at Moradabad to 10 minutes. Considering the MB to be a Divisional HQ, nearly all the trains halt for 7-10 minutes here.
1 more observation:
reduce halt duration at Bareilly to 3 minutes, and increase the halt duration at Moradabad to 10 minutes. Considering the MB to be a Divisional HQ, nearly all the trains halt for 7-10 minutes here.