Search Forum
Blog Entry# 4665666
Posted: Jul 09 2020 (22:11)
3 Responses
Last Response: Aug 03 2020 (00:12)
3 Responses
Last Response: Aug 03 2020 (00:12)
Jul 09 2020 (22:11) FTD/Fatehabad Chandrawatiganj Junction (3 PFs)Ishan.bothra1238gmai 10 blog posts
It will be completed by Aug 2020.
Track linking is going on.
Electrification is also going on.
There is also a new bg Bypass line at FTD station, so that Trains from Ujjain can directly to Ratlam without loco reverse at FTD station.
Track linking is going on.
Electrification is also going on.
There is also a new bg Bypass line at FTD station, so that Trains from Ujjain can directly to Ratlam without loco reverse at FTD station.
Indore -Ujjain-Bhopal train will divert via FTD/Fatehabad Chandrawatiganj Junction rather than Dewas Jn, So there wont be any reversal of loco??
There is no such bypass line. If a train has to travel UJN-RTM through this route, there will be LR at FTD. Train will be stabled at PF. 2 during LR.