Since jasidih bypass rail line does not look possible. I made an alternative line(7.5km length). How is this?
1 Posts
Jsme bypass(Mohanpur-Shankarpur) is already proposed line for trains from Dumka and Godda.Y-leg at Mohanpur and C-line at DGHR, as designed by you, shall avoid all sorts of reversals for BGP side trains as well.
Congestion is there south of jasidih and other existing proposals are costly.
I don't think it's in pink book. The line you are talking about is 20km which will bypass both jasidih & deoghar. And i guess that's why, it is not funded yet even after dubeyji's proposal. I proposed to include jasidih & bypass only deoghar. Cost will be about one-third as 7.5km approx only.
Judge youself which option is better, cost effective & passenger friendly. A or B ?