Search Forum
Blog Entry# 4679663
Posted: Aug 01 2020 (22:11)
46 Responses
Last Response: Aug 02 2020 (22:53)
46 Responses
Last Response: Aug 02 2020 (22:53)
Journey Date: Sat Aug 01
Number of Members on this Trip: 1
SVarma^~
BST/Basti --> LTT/Mumbai LTT
Departure: Sat Aug 01 2020 @ 23:39
Train Status: on time
Last Update: KW/Khervadi 6.2 km<--->0.9 km ODHA/Odha @ Aug 02 2020 (22:53)
Speed: 110 km/h
43 Posts
On Trip
On Time
MTA/Mathela 6.2 km<--->1.1 km KNW/Khandwa Junction
Speed: 1 km/h
waiting for singnel
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
On Time
MTA/Mathela 6.2 km<--->1.1 km KNW/Khandwa Junction
Halted
On Trip
Late: 14m late
JL/Jalgaon Junction 1.7 km<--->9.7 km SS/Shirsoli
Speed: 134 km/h
blasting
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 13m late
JL/Jalgaon Junction 2.2 km<--->9.3 km SS/Shirsoli
Speed: 107 km/h
On Trip
On Time
@ ODHA/Odha
Speed: 110 km/h