Search Forum
Blog Entry# 4684066
Posted: Aug 09 2020 (11:15)
19 Responses
Last Response: Aug 09 2020 (19:56)
19 Responses
Last Response: Aug 09 2020 (19:56)
As the 1st express train now shifted to Hadapsar, soon I hope more trains will be shifted to Hadapsar. Central railways should think about developing infrastructure and transportation here.
Kindly see the attached image:
CR can make a 1 platform at the space marked with a Black star which will be a terminal type. The terminal type doesn't mean it will be a dead-end, but it means the train which will originate/terminate at Hadapsar should be brought on that platform.
Accordingly,...
more...
Kindly see the attached image:
CR can make a 1 platform at the space marked with a Black star which will be a terminal type. The terminal type doesn't mean it will be a dead-end, but it means the train which will originate/terminate at Hadapsar should be brought on that platform.
Accordingly,...
more...
14 Posts
Let's hope for the error :P
It may be Hadapsar or Daund but not Dadar.
It may be Hadapsar or Daund but not Dadar.
But these are good grossing trains why would they be short terminated to Dadar just tell me that? It can be a misprint for sure
Can be Daund or Hadapsar. I don't see any reason for Short terminating a Good train to Mumbai. When Gwalior and Indore have enough trains for Mumbai.
Now understanding the logic of Railways is impossible. Let's see what actually gonna happen. Let's wait for TAAG.