Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

इस मंज़िल पर मिलने वाले, उस मंज़िल पर दोस्त बन जाते हैं

Search Forum
<<prev entry    next entry>>
Blog Entry# 4694370
Posted: Aug 23 2020 (23:28)

24 Responses
Last Response: Aug 24 2020 (20:32)
Info Update
31201 views
22

★★★
Aug 23 2020 (23:28)  
BengaluruDiaries^~   21862 blog posts
Entry# 4694370               Past Edits
Respected Atlas monitors,
I would like to bring to your notice regarding some of the inaccuracies observed in the Atlas.
For your convenience, I have even numbered the pics, which I have attached.
None of the pics are my own and the pic credits go to their respective owners.
...
more...

Here are the details:

Pic 1: It is clearly seen that Panchgachia railway station which is situated in between Saharsa and Garh Baruari, on Saharsa- Saraigarh line is undergoing electrification. But in Atlas, the stretch between Saharsa and Garh Baruari is shown as 'Single Diesel Line', while the stretch between Garh Baruari and Saraigarh is shown as a 'Single Blue line undergoing electrification'.
So please update the entire stretch between Saharsa and Saraigarh as a 'Single Blue line undergoing electrification'.

Pic 2: It is clearly seen that Visakhapatnam Port has no sign of electrification. But in the atlas, the line between Visakhapatnam Jn and Visakhapatnam port is shown as a 'Single Electrified Line'.
So please update that line as a 'Single Diesel Line'.

Pic 3: From the pic on the right side, it is seen that single electrifed line CRS had taken place between Haridaspur and Paradeep. But in the Atlas, Haridaspur- Paradeep line is shown as a 'Double Electrified Line'.
So please update that line as a 'Single Electrified Line'.

Pic 4: It is seen that single electrified line CRS has taken place between Karaila Road Jn and Shaktinagar. But in Atlas, the stretch between Karaila Road Jn- Karaila Road Bypass Cabin is shown as 'doubling+ electrification'. While Karaila Road Bypass Cabin- Shaktinagar stretch is shown as 'Double Electrified Line'.
So please update Karaila Road Jn- Shaktinagar stretch as 'Doubling of Single Electrified Line'

Pic 5: During last year, around June month, the old diesel alignment between Takkolam and Arakkonam had been removed from the Atlas.
But during January 2020, when I travelled from Kanchipuram to Tiruttani temple by car, I observed that the old alignment still existed (unfortunately failed to capture the pic).
So please add old Takkolam- Arakkonam line joining east side of Arakkonam (as mentioned in the pic) as 'Single Diesel Line' in the atlas.

Please take a note of all the above points and kindly do the needful.

Thanks & Regards

Yours respectfully,
Karthik

Translate to English
Translate to Hindi

66 Posts
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy