Search Forum
Blog Entry# 4695463
Posted: Aug 25 2020 (12:46)
23 Responses
Last Response: Sep 02 2020 (00:34)
23 Responses
Last Response: Sep 02 2020 (00:34)
4 Public Posts - Wed Aug 26, 2020
10 Public Posts - Sun Aug 30, 2020
4 Public Posts - Mon Aug 31, 2020
3 Public Posts - Tue Sep 01, 2020
Anara was planned to house a large factory. Later multiple smaller ones came. To adjust them a freight yard was constructed on both sides. This yard compromised the mainline structure. However, SER has in mind to redo the alignment to let pass trains at MPS. Hopefully, with tripling the mainlines will be back along with additional platforms at ANR.
1 Public Posts - Wed Sep 02, 2020