Search Forum
Blog Entry# 4735975
Posted: Oct 06 2020 (18:07)
1 Responses
Last Response: Oct 08 2020 (15:45)
1 Responses
Last Response: Oct 08 2020 (15:45)
Commissioner of Railway Safety/S.E.Circle Inspection of new double line with electrification between Loisingha - Balangir section of
Speed Trial with the Electric Locomotive between Loisingha & Balangir.
Speed Trial with the Electric Locomotive between Loisingha & Balangir.
Great Job done for the people of Western Odisha. Thanks to Indian Railway. Pic of CRS Arriving at Balangir Road Railway Station.
Dt 06.10.2020
Dt 06.10.2020