Search Forum
Blog Entry# 4756245
Posted: Oct 23 2020 (13:04)
9 Responses
Last Response: Oct 23 2020 (15:33)
9 Responses
Last Response: Oct 23 2020 (15:33)
Oct 23 2020 (13:04) 09165X/Ahmedabad - Darbhanga Sabarmati Special (PT) | MAU/Mau Junction (3 PFs) | VGLJ/WDP-4D/40568railfan^~ 17317 blog posts
5 Posts
Yess!!
BSB-GKP section is electrified, therefore all those trains are on E-loco
SHG-MAU-BUI electrification is also under progress.
BSB-GKP section is electrified, therefore all those trains are on E-loco
SHG-MAU-BUI electrification is also under progress.
At the same time 05008 (Krishak Express) arrived at PF no.1 hauled by some WAP4
was unable to capture properly
Posted thru Follow my Trip
was unable to capture properly
Posted thru Follow my Trip
Although the MPS is 100, top speed touched by this train in the section MAU-IAA was around 90.
But still that's also appreciable to attain 91/92 when next stop is just 8kms away.
It was taken on 'North line' of MAU-IAA.
Posted thru Follow my Trip
But still that's also appreciable to attain 91/92 when next stop is just 8kms away.
It was taken on 'North line' of MAU-IAA.
Posted thru Follow my Trip