Only poles have been erected between GIMB to SIOB. Beyond SIOB to VG, even poles are not there. In fact even doubling is pending and as of now, no work is happening on doubling Between SIOB to CHULI
By road I'm travelling almost every 15-20 days between GIMB and ADI. The road over bridge at VG-DHG side near DHG has no signs of poles erection as of 18th Nov 2020. May be work has been started from VG side, which I'm not aware.
I don't know about SIOB-DHG stretch but I have seen OHE poles erected in stretches between DHG-VG from VG side. Btw i travelled by train between ADI-GIMB by 02974 on 9th Nov.
Near DHG no work. But on DHG station many OHE poles present(unerected)