Search Forum
Blog Entry# 4779487
Posted: Nov 15 2020 (18:51)
4 Responses
Last Response: Nov 15 2020 (20:58)
4 Responses
Last Response: Nov 15 2020 (20:58)
Will Baiyappanahalli (from Hosur side) - Banasawadi electrification ever happen?
Is that section pending? Didnt know about that.. Thought this section was electrified..
😅😅Same question
If it does happen, it will be the last in SWR😕
I doubt whether it will be used in future.. All trains travelling in that route might be diverted via TCTB
If it does happen, it will be the last in SWR😕
I doubt whether it will be used in future.. All trains travelling in that route might be diverted via TCTB
no it is pending , due to land acquisition problems as the land belong to Defense in this railway line
If if belongs to defence, it would be a problem. Same thing happened with AJJ-TKO. INS Rajali didnt permit electrification. That is why new line was constructed. But in this case, trains may be diverted via BYPL.