Search Forum
Blog Entry# 4809520
Posted: Dec 11 2020 (13:53)
7 Responses
Last Response: Feb 24 2022 (13:29)
7 Responses
Last Response: Feb 24 2022 (13:29)
Dec 11 2020 (13:53) 53051/Azimganj - Nimtita Passenger (UnReserved) | NILE/Nimtita (3 PFs)
SAPTARSHI^~
SAPTARSHI^~ 26396 blog postsCRS Inspection of 'Electrification' of Single line between Rampurhat & Harinsingh was conducted on 10.12.20. (Howrah division)
CRS Inspection of 'Electrification' of Single/Double line between Manigram & Nimtita is conducted on 11.12.20. (Malda division)
CRS Inspection of 'Electrification' of Single/Double line between Manigram & Nimtita is conducted on 11.12.20. (Malda division)
4 Posts
CRS Inspection of 'Electrification' of Single line between Harinsingh & Dumka is conducted on 24.02.21. (Howrah division & Asansol division)
(Collected images)
(Collected images)
CRS Inspection of 'Electrification' of Single line between Bhagalpur & Banka is conducted on 16.03.21. (Malda division)
(Collected images)
(Collected images)
CRS Inspection of 'Electrification' of Single line between Jasidih & Banka is conducted on 24.02.22. (Asansol division)
(Collected images)
(Collected images)