Search Forum
Blog Entry# 4814147
Posted: Dec 16 2020 (11:08)
21 Responses
Last Response: Dec 17 2020 (10:34)
21 Responses
Last Response: Dec 17 2020 (10:34)
New/Special Trains
ECR/East Central
ELSG^~ 4173 news posts
धनबाद से दक्षिण भारत को जोड़ने वाली अलेप्पी एक्सप्रेस के जल्द चलने की संभावना है। धनबाद रेल मंडल की ओर से इस ट्रेन की बढ़ती डिमांड...
16 Posts
60-70 I guess final
Avg zones if remove 3+ so 15-20 stops can be removed easily it can be one way or both sides
Avg zones if remove 3+ so 15-20 stops can be removed easily it can be one way or both sides
Bilkul sir as bahut halts h average speed badly need to increase
IR m halts removal bahut bada challenge h ek baar mil gya to hatna bahut tough h as kahi ek jagah koi issue nhi to dusre jagah k log protest krna start krdete h good for example av gahmar dildarnagar pnbe ddu section m halts removal kuch train k Hatne se waha protest start ho gya rail line blockage as even waha se buxar hardly 30 km people from ghazipur and surrounded area unable to travel barely 18 km to buxar catch the train so logo ko cooperation hona chahiye ki speed up timing k liye kuch unnecessary halts removal hona chahiye
Yes agree. This train has lots of day time stops in SCR, SR ( both ways). It has to be seen which stops get removed. Most of the stops in Ecor are at night ( both sides) so few can be removed there as well.
Ecor will remove stops as we have seen for vskp-korba,vskp-kriandul exp etc
TT will come by 1-3 days if dec 22 is start of its first run
TT will come by 1-3 days if dec 22 is start of its first run