Search Forum
Blog Entry# 4816446
Posted: Dec 18 2020 (21:03)
35 Responses
Last Response: Dec 19 2020 (13:35)
35 Responses
Last Response: Dec 19 2020 (13:35)
Journey Date: Fri Dec 18
Number of Members on this Trip: 1
akshu51
SBC/KSR Bengaluru City Junction (Bangalore) --> KPG/Kopargaon
Departure: Fri Dec 18 2020 @ 19:20
Train Status: 8m late
Last Update: CIT/Chitali 0.7 km<--->7.3 km PB/Puntamba Junction @ Dec 19 2020 (13:35)
Speed: 29 km/h
30 Posts
On Trip
Late: 16m late
@ DD/Daund Junction
Speed: 2 km/h
02164 overtakes us here at Daund, now this controlling makes good sense. Karnataka exp anyhow has a longish halt for the D loco to be detached and taken away.
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 12m late
VL/Vilad 1.5 km<--->4.2 km DAH/Dehare Cabin
Speed: 4 km/h
looped in to let Jhelum express cross us
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 17m late
@ DAH/Dehare Cabin
Speed: 103 km/h
that was a thunderous crossing, powered by the work horse of IR WAP 4
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 6m late
BAP/Belapur 2.8 km<--->7.1 km CIT/Chitali
Speed: 84 km/h
we are getting preference over goa exp, which has been looped in Chaitali to let us pass
Posted thru Follow my Trip
Posted thru Follow my Trip
On Trip
Late: 8m late
@ CIT/Chitali
Speed: 29 km/h
it is a slow sedate crossing of Goa exp at Chitali. After being before time at almost all major landmarks till Belapur, looks like we'll be delayed at KPG, may be a very minor delay
Posted thru Follow my Trip
Posted thru Follow my Trip