Search Forum
Blog Entry# 4821539
Posted: Dec 23 2020 (23:34)
2 Responses
Last Response: Jun 30 2021 (19:56)
2 Responses
Last Response: Jun 30 2021 (19:56)
Secunderabad to Vijayawada there are already 4 lines
Triple line via Kazipet
Single line via Nalgongonda - Guntur
Then why for Secunderabad - Guntur Doubling.
This is totally unfair
Triple line via Kazipet
Single line via Nalgongonda - Guntur
Then why for Secunderabad - Guntur Doubling.
This is totally unfair
Freight traffic on bza - kzj line and Nadikudi Skht line complete aithe south bound traffic can also be diverted from both Sc/gnt sides.
What do u mean 4 lines, they r just two lines, one via Kazipet n one via Guntur.