Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bhrigu Express: बलिया की आन बान और शान , भृगु एक्सप्रेस है तुम्हारा नाम। हर रविवार तुमसे मिलना है मेरा काम। - Shanzil Kabir

Search Forum
<<prev entry    next entry>>
Blog Entry# 4821759
Posted: Dec 24 2020 (11:00)

2 Responses
Last Response: Dec 24 2020 (12:22)
Rail News
38522 views
2

Dec 24 2020 (10:59)   Trains from Indore: इंदौर से बीकानेर रोज ट्रेन चलाने की मांग

Sonugaya~   218 news posts
Entry# 4821759   News Entry# 429835         Tags   Past Edits
इंदौर, नईदुनिया प्रतिनिधि, Trains from Indore। इंदौर से बीकानेर के बीच रोज ट्रेन चलाने की मांग की गई है। इससे यात्रियों को काफी फायदा होगा। भाजपा...

Rail News
33620 views
0

Dec 24 2020 (12:18)
A2Z~
A2Z~   17505 blog posts
Re# 4821759-1              
** Indian railways seem to introduce new trains on considerations more based on the recommendation/ gut feeling of Political Big wigs/ RMs/ top IR bureaucrats/ Members of railway consultative committees etc instead of concrete rail-road-air traffic survey of the route.
** IR should make it a standard practice to introduce new trains on trial basis for a definite period say 6 months and based on the detailed study of patronage and feedback from travelers, decide
(1) Whether to continue the train operation and if yes then
(2) End
...
more...
destinations, Stoppages, Rake composition, Frequency of operation etc.
** A team should be dedicated solely to study and prepare traffic survey reports at IR level and not on divisional/zonal level so that tendency of proposal/introduction of intra zonal trains will not be there

** Indian railways seem to introduce new trains on considerations more based on the recommendation/ gut feeling of Political Big wigs/ RMs/ top IR bureaucrats/ Members of railway consultative committees etc instead of concrete rail-road-air traffic survey of the route.
** IR should make it a standard practice to introduce new trains on trial basis for a definite period say 6 months and based on the detailed study of patronage and feedback from travelers, decide
(1) Whether to continue the train operation and if yes then
(2) End destinations. Stoppages. Rake composition. Frequency of operation etc
** A team should be dedicated solely to study and prepare traffic survey reports at IR level and not on divisional/zonal level so that new trains are introduced solely based on the traffic requirements without any tendency of keep the trains intra zonal.

Translate to English
Translate to Hindi

1 Public Posts - Thu Dec 24, 2020
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy