Search Forum
Blog Entry# 4823375
Posted: Dec 25 2020 (16:03)
47 Responses
Last Response: Dec 26 2020 (19:20)
47 Responses
Last Response: Dec 26 2020 (19:20)
Journey Date: Sat Dec 26
Number of Members on this Trip: 1
Mehta_Udit^~
CSMT/Mumbai CSM Terminus --> LNL/Lonavla
Departure: Sat Dec 26 2020 @ 17:10
Train Status: on time
Last Update: @ LNL/Lonavla @ Dec 26 2020 (19:20)
Speed: 1 km/h
42 Posts
On Trip
On Time
KAD/Khandala 2.2 km<--->1.3 km LNL/Lonavala
Speed: 47 km/h
Reaching the end of journey soon .
On Trip
On Time
@ LNL/Lonavala
Speed: 14 km/h
.before time a trip lnl
Was wishing this only
As I had 7 mins Turn around time
Was wishing this only
As I had 7 mins Turn around time
What were the bankers of your train today ??
Wag7
On Trip
On Time
@ LNL/Lonavala
Speed: 1 km/h
DQ departs from lnl and trips ends .