Search Forum
Blog Entry# 4831572
Posted: Jan 02 2021 (16:15)
6 Responses
Last Response: Jan 02 2021 (23:25)
6 Responses
Last Response: Jan 02 2021 (23:25)
1 Posts
Dbrg-ghy-njp-kir-bju-hjp-gkp-lko-mb-dli route should also be made 130 fit...and some stretches in between need to tripled like be-gzb,gkp-lko and cpr-hjp
Yeah. Railways are working on this and should be done before 2024
Sad to see no BZA - VSKP NOT in this of upgraded into 130 kpmh
But again the travel time will not be reduced coz by the time all these projects will be completed we can expect the traffic to be doubled as well...so it will be a kind of stalemate..
As agree sir but moradabad lko sre section m 130 mps is distant dream even if get 130 mps controlling will remain just average