Search Forum
Blog Entry# 4845425
Posted: Jan 15 2021 (10:43)
20 Responses
Last Response: Jan 23 2023 (09:06)
20 Responses
Last Response: Jan 23 2023 (09:06)
Temporary modification in operation between Singur & Nalikul in Seoraphuli-Tarakeswar Double line section (in connection with passage of Dankuni-Chandanpur 4th line through Kamarkundu)
Posted thru Follow my Trip
Posted thru Follow my Trip
15 Posts
Are there any plans to increase MPS to 100/110 kmph in this section now?
Don't think so...this is one of the slowest branch line of HWH div, sleeper conditions are terrible & cracked, and I don't see any track modification works either
CRS inspection for reopening of reconstructed Double line b/w SIU-NKL on 23.01.2023