Crs Inspection Bza bvrt Electrification Scheduled from jan 19-23 Scr Lgd WAP 7 30655 .will be used for conducting speed test
Pic credits : Manoj
Pic credits : Manoj
2 Public Posts - Tue Jan 19, 2021
6 Public Posts - Wed Jan 20, 2021
During normal times, how many trains used to run in this route ? After doubling will the running time between VSKP-BZA via Eluru and via BVRT be almost the same ?
They can move trains to this route as well for better connectivity and reduce congestion as well