Search Forum
Blog Entry# 4858392
Posted: Jan 27 2021 (18:22)
7 Responses
Last Response: Jan 28 2021 (10:26)
7 Responses
Last Response: Jan 28 2021 (10:26)
Baiyyappanahalli coaching terminal is being developed as future Transport hub with all latest amenities.
Once completed , this will be first station in India with Centralized AC click here
Source : SBC DRM - twitter
Once completed , this will be first station in India with Centralized AC click here
Source : SBC DRM - twitter
2 Posts
I don't think so. The road is narrow from ayyappa temple (flyover) and Orion mall side- I don't think anything can be done this side. They should definitely think of getting metro to this station.
Should be accessible. Otherwise no use for passengers. SWR should work with BBMP and other local authorities and find a way out of this.
Getting metro to a place which is deep inside a corridor is difficult and that when roads are narrow. Moreover long distance travellers with luggage depend on private transport like Auto and Cab then bus and local trains (50-70%).As Metro starts from BYPL and Airport Corridor from KJM and sik board Corridor integrated terminals should be there in KJM and BYPL so that travellers need not take detour off the main corridor be it metro or road for private transport. Even city bus connectivity to different parts of SBC is well connected to both