Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

NTES is the salt of Railfanning. IRI is the sugar. - Kirti Solanki

Search Forum
<<prev entry    next entry>>
Blog Entry# 4863312
Posted: Feb 01 2021 (10:14)

17 Responses
Last Response: Feb 02 2021 (13:29)
General Travel
22702 views
7

Feb 01 2021 (10:14)   02796/Lingampalli - Vijayawada InterCity Special | GNT/Guntur Junction (7 PFs)
Ramkumar^~
Ramkumar^~   18512 blog posts
Entry# 4863312            Tags  
Today 02796 Intercity Excellent running 23 minutes BT Arrived to GNT. SC - GNT Non-Stop 281 KMS it's Covers 3:30 HRS AVG speed:- 80.
In this budget we hope to give funds to NLPD -
PGDP doubling. Once his route doubling is completed its cover SC - GNT Non-Stop 3-3:30 HRS AND SC - BZA 4:15-4:30 HRS.
Translate to English
Translate to Hindi

12 Posts

8471 views
0

Feb 01 2021 (14:20)
vsaikrishna23~
vsaikrishna23~   2539 blog posts
Re# 4863312-13              
undedi pune bbs that to Friday only adi kuda sc bza lo full slack bandi next LTT COA adi kuda SC GNT madhyalo bariga slack undi migilindi LPI NS danini pakkana petadaniii alochistunaru ante duronto ani peru tesyachu
Translate to English
Translate to Hindi

7556 views
0

Feb 01 2021 (21:28)
Ramkumar^~
Ramkumar^~   18512 blog posts
Re# 4863312-14              
BBS, COA express trains anta slack ante mari PGDP - GNT madya daily trains crossing untay. Main ga KCC daggara BZA division vadiki handover cheyyali train ni KCC ki BZA division vadu ye time proposed chesado aa time ki ivvali. Oka vela Duronto, LTT veetini meeru annatu slack lekunda tondaraga teesukuvachina train ni BZA division ki handover chesetappudu time undiga ani akkada KCC lo aapestadu appudu crossings ki aapite enti time undi ani KCC lo aapite enti? Ekkadaina okate ga
Translate to English
Translate to Hindi

6988 views
0

Feb 02 2021 (12:46)
GunturJunction~
GunturJunction~   144 blog posts
Re# 4863312-15              
Presently, normal Superfast Tatkal fare is collected from passenger of Train No. 02204/02203.

When the Duronto (dynamic) fare is not collected from passengers of Train No. 02204/02203, why should it be considered/called as a Duronto ?

In
...
more...
what way, it is different from other trains, which are also running with Tatkal fare ?

Translate to English
Translate to Hindi

8085 views
2

Feb 02 2021 (12:58)
GunturJunction~
GunturJunction~   144 blog posts
Re# 4863312-16              
Is major junction(s) / terminal station(s) are able to accommodate arrival/departure of train(s), post speed up ?

Because, yesterday's Train No. 02783 VSKP-AC had started from GNT at 02:11 & reached MLY at 06:10 (03:59 hours for 276 KM's, average 69 KMPH). But, this train was detained at MLY for 06:40 (for 30 minutes), and finally reached SC at 07:00 (10 minutes early, than scheduled arrival time).
...
more...

Any specific reason for detention at MLY, except terminal constraint at SC ?

What is the use of aggressive run between GNT-MLY, when it took 50 minutes (after reaching MLY) to reach it's destination (which is just 6 KM's far) ?

It is a live example to clear our myths, when we speak about speeding up of trains, just by quoting Section Speed, Train Name, Stoppages etc.

Translate to English
Translate to Hindi

5074 views
0

Feb 02 2021 (13:29)
Bezawada
Bezawada   319 blog posts
Re# 4863312-17              
speedster of SCR....ah GNT BZA tracks ni kuda konchem strengthen chesi, run time ni 35 mins to 40 mins pedithe...10 ki BZA lo petteyachu bandi ni
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy