Search Forum
Blog Entry# 4916682
Posted: Mar 23 2021 (19:46)
7 Responses
Last Response: Mar 25 2021 (11:45)
7 Responses
Last Response: Mar 25 2021 (11:45)
Slowed down by 30 minutes inspite of LHB rake😶😐
TN and TNSK bhai bhai 😤😤
TN and TNSK bhai bhai 😤😤
2 Posts
130 km/hr , LHB aur ZBTT ka fayda kya jab speedup hi nahi naa ho 😡😡😡
May be some one in NCR/IR giving tough time for SR/MAS trains.
There is no valid reason to still run TN at 110 MPS when its already running with 120MPS in SCR since LHB conversion.
No trains from MAS had TTZB. All were slowed down. Wastage if IR enhanced resources and time.
There is no valid reason to still run TN at 110 MPS when its already running with 120MPS in SCR since LHB conversion.
No trains from MAS had TTZB. All were slowed down. Wastage if IR enhanced resources and time.
Is better mail m convert krdete as simply sf wali mps mail k price p😀
Ha sahi bola aapne as speed up ki baat kre to ndls bza mas section m speed hua hi nhi bs kuch 2 se 3 train bs wahi ndls ddu section bahut si traino ko speed up hua h compare to other section