Search Forum
Blog Entry# 4956295
Posted: May 07 2021 (12:11)
19 Responses
Last Response: May 07 2021 (15:00)
19 Responses
Last Response: May 07 2021 (15:00)
Transfer of Electric locos in April 2021
🔥VSKP ELS Transferred 15-WAG9H to VSKP DLS
🔥KJGY ELS Transferred 6-WAG7 to LKO DLS
🔥GZB ELS Transferred 4-WAP7 to TKD DLS
🔥ED ELS Transferred 3-WAP4 to ED DLS...
more...
🔥VSKP ELS Transferred 15-WAG9H to VSKP DLS
🔥KJGY ELS Transferred 6-WAG7 to LKO DLS
🔥GZB ELS Transferred 4-WAP7 to TKD DLS
🔥ED ELS Transferred 3-WAP4 to ED DLS...
more...
14 Public Posts - Fri May 07, 2021
Actually there was some post in some site stating that GY DLS would be homing WDG 4G AND 6G in south india .This happened when these locos came for trials to MLY shed. If anyone remembers it they can share it.But later it was told that only GIMB AND ROZA DLS would be homing. I think around 1000 GE Diesel locos would be manufactured so as both GE DLS are in north so in south GY might get after few years.Actually the plan should have been 1 GE DLS at ROZA an other at GY so that there would. Loco shed 1 in north and 1 in south. Similarly WAG 12 sheds should have been at SRE and LGD.
...
more...
...
more...
4 Public Posts - Fri May 07, 2021