Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

आम लोग: "रेल फैनिंग आती नहीं". RailFans: "रेल फैनिंग जाती नहीं" - Md Asif

Search Forum
<<prev entry    next entry>>
Blog Entry# 4961851
Posted: May 14 2021 (11:32)

1 Responses
Last Response: May 14 2021 (11:49)
Info Update
13431 views
9

May 14 2021 (11:32)   BGP/Bhagalpur Junction (6 PFs)
KhagariaJn2~
KhagariaJn2~   660 blog posts
Entry# 4961851            Tags   Past Edits
भागलपुर जंक्शन पुनर्विकास परियोजना


Rail Land Development Authority (RLDA) has recently issued LoA (Letter of Acceptance) to M/s. ARINEM Consultancy Services Pvt Ltd for providing Consultancy Services for Re-development of Bhagalpur Railway Station.
...
more...

Contract Details:

Tender No.: RLDA/RFP/CT-105 of 2020

Name of the work: Consultancy Services for Feasibility Study, Detailed Master Planning, Urban Designing, Engineering & Preparation of Detailed Project Report (DPR) for Integrated Re-development of Bhagalpur Railway Stations of Malda Division (Eastern Railway).

Time for completion of work: 6.5 months

About the project:

This Railway Station is to be redeveloped using state of art technology for giving better passenger amenities, colony and maximize the revenue.RLDA has desired to select Consultant for Consultancy services for Feasibility Study, Detailed Master Planning, Urban Designing, Engineering & Preparation of Detailed Project Report (DPR) for Integrated Re-development of Bhagalpur Railway Stationen trusted to it by Ministry of Railways for Commercial Development with the objective of providing state of art passenger amenities and maximizing revenue.

Site Details:

Bhagalpur Railway Station is located in Malda Division of Eastern Railway.

Site Code: 02080501
Project Area: approx 7.5 Ha
Study Area: approx 5.5 Ha

Additional Details:

Work Plan: The consultant should propose and justify the main activities of the Assignment/job, their content and duration, phasing and interrelations,  milestones  (including interim approvals by the Employer), and delivery dates of the reports. The proposed work plan should be consistent  with the  technical  approach  and  methodology,  showing  understanding  of the TOR and ability to translate them into a feasible working plan.

Presentation: The consultant would be required to make a presentation on the approach & methodology, work  plan, Tentative Design/Concept Plan  (based on Historical & Cultural Heritage  and  modernity) and proposed  team  for  performing  the  assignment  as  and  when intimated by the Employer during the Evaluation Process.

Source : click here

Translate to English
Translate to Hindi

10453 views
0

May 14 2021 (11:49)
MR_INDIANRAILIN   17498 blog posts
Re# 4961851-2              
Khagaria 1 ko kya hua 🤔
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy