Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFanning is our All-Rounder Glucose that gives us Instant Power in All Seasons - Kirti Solanki

Search Forum
<<prev entry    next entry>>
Blog Entry# 4967515
Posted: May 22 2021 (22:37)

4 Responses
Last Response: Jun 10 2022 (14:44)
Info Update
59382 views
10

May 22 2021 (22:37)   SNTD/Santaldih (3 PFs)
Ahin17~
Ahin17~   1676 blog posts
Entry# 4967515            Tags  
RITES LTD. Invited tender for electrifcation and other ancillary works for Bhojudih coal washery in Adra div.

04/OT/BCCL-Bhojudih/Electrical /2021Dated 19.05.2021 Name of Work Design, Drawing, Supply, Testing Commissioning of 25 KV AC OHE with Santaldih SSP modification and Other Electrical Works on Renovation/ Strengthening of the existing Railway Siding at Bhojudih Coal Washery,Santaldih Dist — Purulia, West Bengal, PKG-III. Estimated Cost: Rs 12.45 Cr Earnest Money: NA Period of completion: 12(Twelve ) months. Last time & date of submission of bid: upto 11.00 hrs. on 09.06.2021.
Translate to English
Translate to Hindi

1 Posts

27636 views
5

May 31 2021 (17:46)
Ahin17~
Ahin17~   1676 blog posts
Re# 4967515-2              
continuation of the previous post .

Here are details of the redevelopment work for Bhojudih Coal washery -

The work to be governed by this contract shall cover Design, drawing, procurement,
...
more...

fabrication, Manufacturing, transportation to destination in safe custody at site, supply,
erection, testing and commissioning of 25 KV OHE System of the following:

(a)Extension of existing line - 4 to connect proposed Hopper Line at Terminal End.

(b)Realignment of existing Bunker Line 1, 2 & extension of existing lines into buffers at terminal end.

(c) Provision of cross over connecting lines 2 & 4.

(d) Dismantling of existing line – 5 in full.(e) Realignment / Dismantling of existing line – 6 to connect propose engine line & 3 Bunker lines.

(f) Realignment & termination of existing line – 7 and provision of cross over at terminal end connecting proposed lines 7 & 6.

(g) Realignment of existing line – 8 to connect proposed line – 6

(h) Realignment of existing line – 9 to meet proposed line – 8

(i) Provision of cross over connecting
Hopper line & Engine Line

(j) Provision of cross over connecting proposed line 8 & existing line 10.

(k) Realignment & extension of line-10 to buffer ended line at terminal end.

(l) Provision of a buffer ended engine line connecting Hopper line at either end.

(m) Linking of line 1 with buffer ended line 2 at terminal end.

(n) Provision of a BV siding loop on engine line.

(o) Linking of line 3 with line 4 & 5 and provision of a cross over between lines 2 & 3 at Terminal end and to end into buffer.

Translate to English
Translate to Hindi

30905 views
1

May 31 2021 (18:37)
IlovemyINDIA~   2584 blog posts
Re# 4967515-4              
Good.
But everything related to Freight business in SER.
Translate to English
Translate to Hindi

25179 views
0

May 31 2021 (19:04)
Ahin17~
Ahin17~   1676 blog posts
Re# 4967515-5              
Basically Adra and Dhn div competing for coal loading target.
Translate to English
Translate to Hindi

3231 views
0

Jun 10 2022 (14:44)
Prem12828Exp
Prem12828Exp   11 blog posts
Re# 4967515-6               Past Edits
Yes I agree with you 😂😂
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy