Search Forum
Blog Entry# 4993225
Posted: Jun 23 2021 (18:56)
9 Responses
Last Response: Jun 24 2021 (19:29)
9 Responses
Last Response: Jun 24 2021 (19:29)
Jun 23 2021 (18:56) 09413XXX/Sare Jahan Se Achchha Special | KTE/Katni Junction (6 PFs)
CrazyTraveller~
CrazyTraveller~ 3540 blog postsA WR proposal from Indore to kolkata... Via singrauli
daltonganj dhanbad.. .. its has good timing as it reaches dto at 23 pm and kolkata apx 10 or 11 am from kolkata at 20.00 and it reaches daltonganj at 6 am 8 in the morning
Ps: proposed down timing is not correct considering the track situation and senario, considering running time of 09413 from ujjan to kolkata
daltonganj dhanbad.. .. its has good timing as it reaches dto at 23 pm and kolkata apx 10 or 11 am from kolkata at 20.00 and it reaches daltonganj at 6 am 8 in the morning
Ps: proposed down timing is not correct considering the track situation and senario, considering running time of 09413 from ujjan to kolkata
4 Posts
Mahdeiya is the entry point of ECR near Singrauli, where the control is handed over by JBP division of WCR to DHN division of ECR....
Similarly Pradhankanta is the exit point of ECR post Dhanbad, where the control is handed over by DHN division of ECR to ASN division of ER!
It is unlikely that the train will go from Singrauli to Dhanbad via CAR (LR)-DDU-GAYA or GHD(LR)-DOS(LR)-GAYA. Plus looking at the TT it seems obvious that this train would go through the Coal India Corridor.....
Similarly Pradhankanta is the exit point of ECR post Dhanbad, where the control is handed over by DHN division of ECR to ASN division of ER!
It is unlikely that the train will go from Singrauli to Dhanbad via CAR (LR)-DDU-GAYA or GHD(LR)-DOS(LR)-GAYA. Plus looking at the TT it seems obvious that this train would go through the Coal India Corridor.....
I hope this train gets accepted it's been some time since CIC got any trains. Timings are good as well.