Search Forum
Blog Entry# 4993476
Posted: Jun 23 2021 (21:37)
2 Responses
Last Response: Jun 23 2021 (21:58)
2 Responses
Last Response: Jun 23 2021 (21:58)
Jun 23 2021 (21:37) 06228X/Talguppa - Mysuru Express Special (Via KSR Bengaluru) | MLSA/Mallasandra (3 PFs)
HA5H~
HA5H~ 2422 blog postsMallasandra Electrification (SBC UBL Section)
🔹Almost Done - Wiring Left
🔹Pole Being Erected at Pf.1
🔹Spotted Wiring Wagon on 20.06.21 at MLSA Pf.3
Date 19.06.21_02:55Hrs
🔹Almost Done - Wiring Left
🔹Pole Being Erected at Pf.1
🔹Spotted Wiring Wagon on 20.06.21 at MLSA Pf.3
Date 19.06.21_02:55Hrs