4.0 Weaknesses
4.1 Rakes are not maintained in one Hook.
In washing siding, the pitline capacity is of 17 and 16 coaches only. The
trains maintained here are having composition more than 17 coaches and the
rakes...
more...
4.1 Rakes are not maintained in one Hook.
In washing siding, the pitline capacity is of 17 and 16 coaches only. The
trains maintained here are having composition more than 17 coaches and the
rakes...
more...
Environment Friendly Toilets: The first lot of 43 IR-DRDO
Bio-toilets have completed more than one year in service without
any bacteria recharging. ICF- NFR rake in service since
October 2011, Five more trains are being turned out by RCF by
March...
more...
Bio-toilets have completed more than one year in service without
any bacteria recharging. ICF- NFR rake in service since
October 2011, Five more trains are being turned out by RCF by
March...
more...
CLW has manufactured only 59 High Horse Power Locomotives (WAG-9/WAP-
5/WAP-7) till Jan. 2012 against the year’s target of 100. CLW should step up production
of HHP locomotives.
5/WAP-7) till Jan. 2012 against the year’s target of 100. CLW should step up production
of HHP locomotives.
ICF must turn out the LHB chair car rake by March, 2012 as it is to required to run an
announced train.
announced train.