Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

ಮೈಸೂರು - ವಾರಣಾಸಿ ಎಕ್ಸ್‌ಪ್ರೆಸ್: ಕಾವೇರಿ ಮತ್ತು ಗಂಗಾ ನದಿಗಳ ಸಂಪರ್ಕ ಸೇತುವೆ - Vishwanath Joshi

Search Forum
<<prev entry    next entry>>
Blog Entry# 5001659
Posted: Jul 01 2021 (17:56)

9 Responses
Last Response: Jul 07 2021 (18:09)
General Travel
19990 views
8

Jul 01 2021 (17:56)   ADRA/Adra Junction (4 PFs)
Ahin17~
Ahin17~   1678 blog posts
Entry# 5001659            Tags  
ACHIEVEMENTS OF ADRA DIVISION - 2020-21

1 190.29 KM Track Renewals have been done which is 361.31% above the target.
2 190.11km Deep Screening of plain tracks have been done which is 107.39% above the target.
3
...
more...
319 Nos of Deep Screening of turnout have been done which is 45% above the target.
4 14 Manned Level Crossing have been eliminated in different sections, 9 by diversion & 5 by
construction of LHS & NHS.
5 8 Permanent Speed restrictions have been removed against the target 5 Nos.
6 10 Nos of Mechanical lever frame system have been replaced by new EI in addition to 2 nos of
panels have been replaced by EI.
7 Cement Loading has improved by 72% in the current financial year 2020-21. Total 1.55 MT
Cement loading has been done from the following different cement plants.
8 Steel loading has been improved by 7% in the current financial year 2020-21. Total 3.81
MT steel loading has been done.
9 COAL LOADING : New traffic, 36 Nos. of Coal Rakes loaded from BQA Goods shed for the first
time.
10 RTPS(Raghunathpur Thermal Power station) siding by DVC has been commissioned(20.873 KM )
taking off from Joychandipahar station.
11 Speed of the Goods train has increased to 51.33 KMPH during the current financial year 2020-21
as compared to 33.49 KMPH during last financial year 2019-20 i.e. improvement by 52% .
12 Improvement of Goods Shed done at Chowrasi & Rukni including Wharf, illumination, Merchant
house etc .
13 Tender awarded for operation and maintenance of MFC/Adra for 12 years & License Fee received
Rs.8.48 Lakhs.
14 Total scrap sale through auction has been achieved Rs.24.12 Cr in 2020-21 against 23.61 Crore in
2019-20.
15 During 2020-21, 581 CC rakes examinations were done where as 86 CC rake examinations were
done in 2019-20.
16 Diesel Loco shed has been converted & renamed to Electric Loco shed Ispatnagar and now 75
Electric Locomotive have been maintained by ELIN & TOH has been started.
17 8 FOBs have been completed in the financial year 2020-21 at TLE,BCB, VAA,RUI,VSU,BWCN
NIM, KTD, & at CHHRA, BXL,BUTA girder launching done.
18 In the BQA-SONA-MASHAGRAM section 120.135 KM has been electrified & 1st MEMU train has
made operational .
19 23.447 TKM electrification done by Railway in different sections including JSW siding.
20 First HRMS help desk of Indian railways ‘AHSAS’ ie Adra HRMS Assistance System with features
like online and manual grievance registration, monitoring and redressal started successfully. More
than 400 grievance registered and redressed on time. Live HRMS classes have been initiated for
ministerial staff of all departments. 10 batches have been trained in different modules of HRMS.

Translate to English
Translate to Hindi

4 Posts

8146 views
0

Jul 06 2021 (20:37)
Ahin17~
Ahin17~   1678 blog posts
Re# 5001659-5              
Nope.Then you have to check with the divisional chief engineer. Let me check once..if i find something. Could
you provide me the tender details? Then it will be helpful to find.
Translate to English
Translate to Hindi

7724 views
0

Jul 06 2021 (20:40)guest
Re# 5001659-6               Past Edits
tomader karo icms data ache?
Translate to English
Translate to Hindi

7686 views
0

Jul 06 2021 (20:41)guest
Re# 5001659-7               Past Edits
tomader karo icms data ache?
wag 12 60042 er data ta dekhar chilo
Translate to English
Translate to Hindi

7549 views
0

Jul 06 2021 (22:09)
Ahin17~
Ahin17~   1678 blog posts
Re# 5001659-8              
@5001659-6  @guest
Nah Go..Icms r data nei.
Translate to English
Translate to Hindi

6533 views
1

Jul 07 2021 (18:09)
surjitbasu~
surjitbasu~   1383 blog posts
Re# 5001659-9              
Currently there is no such active tenders for CKP I guess.. Station Building/additional platform construction work is normally included in the doubling/tripling tender only and not any separate tender.
For example purpose you can take the below third line related tender in JSG Area:
click here
See if any drawings are available for this one.. then we will get an idea of where
...
more...
to get them from.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy