Search Forum
Blog Entry# 5003823
Posted: Jul 03 2021 (19:52)
2 Responses
Last Response: Jul 04 2021 (17:00)
2 Responses
Last Response: Jul 04 2021 (17:00)
Some latest pics from Sathiaon Railway Station.
Works being carried out for different things under Electrification and Doubling Project.
New station building, platform 2, height raising of platform 1, aap etc being constructed....
more...
Works being carried out for different things under Electrification and Doubling Project.
New station building, platform 2, height raising of platform 1, aap etc being constructed....
more...
1 Public Posts - Sun Jul 04, 2021
No dear.....these 2 lines are the old one which made this station as crossing station.
Soon it will have 2 more lines making 4 in total with 2 mainline and other 2 as loop line.
It will have 2 high level and full length platforms
Soon it will have 2 more lines making 4 in total with 2 mainline and other 2 as loop line.
It will have 2 high level and full length platforms